Site visit report
Timber-frame house, Dovilai
Done3
- Wind barrier fitted on the east and south walls
- 6 of 9 windows installed
- Roof flashing started


Worth clarifying2
- Window W4 joint tape not pressed down along about 20 cm at the bottom, photos 14–16
- A tear in the wind barrier at the north corner, photo 21


Waiting for your decision1
- Facade board colour: two samples fixed by the entrance, photo 30

Ask the contractor2
- When will the W4 joint be finished, and who will check it?
- Will the tear be taped before the facade goes on?
For a specialist1
- I recommend a structural engineer checks the roof connection at the chimney








