Demonstration project
Attic conversion
An attic in an older house is being converted. The owner wants to see the insulation and membranes before plasterboard covers them.
- Location
- Klaipėda
- Service
- Construction monitoring
- Scope
- 3 frames

Approach
The attic is photographed when the insulation and membranes are in place but not yet covered. Particular attention goes to the junctions around the roof window and the joists, because they will not be visible later.
Deliverables
- 01Insulation and membrane photographs before closing in
- 02Roof window junction details
- 03Points worth raising with the contractor
Frames




