Demonstration project

Attic conversion

An attic in an older house is being converted. The owner wants to see the insulation and membranes before plasterboard covers them.

Location
Klaipėda
Service
Construction monitoring
Scope
3 frames
Roof rafters and membrane during construction
Demonstration project. A concept, not client work. Images are AI-generated.

Approach

The attic is photographed when the insulation and membranes are in place but not yet covered. Particular attention goes to the junctions around the roof window and the joists, because they will not be visible later.

Deliverables

  1. 01Insulation and membrane photographs before closing in
  2. 02Roof window junction details
  3. 03Points worth raising with the contractor

Frames

A taped vapour barrier joint with a scale bar
01A taped vapour barrier joint with a scale bar
Roof window junction with insulation before it is closed in
02Roof window junction with insulation before it is closed in

Tell me about your project

Write what the property is, where it is and what you need. I will reply with how I can help.

Discuss your project